Preparing N500 Net Bridge and Connected Bus Devices for Deployment
This section describes how to prepare the N500 Net Bridge and connected bus devices for deployment.
Proceed as follows.
Select your region
Please continue with English site or select other region below.
North Americaå>
Asia–Pacificå>
Home » iLOQ Manager » 5 Series » 5 Series User Guide » iLOQ Online System and Devices » Deploying the iLOQ Online System Hardware » Preparing N500 Net Bridge and Connected Bus Devices for Deployment
This section describes how to prepare the N500 Net Bridge and connected bus devices for deployment.
Proceed as follows.
The internal test procedure will now start.
Check that:
The green FW/Devices light flashes as many times as there are devices on the main bus.
After a pause, the green FW/Devices light flashes as many times as there are devices on the reader buses.
After a pause, the green FW/Devices light flashes as many times as there are locks connected to the Door Modules.
When the bus configuration has been saved successfully, the FW/Devices light will switch to a solid orange colour, the POWER, RS-485 and SYSTEM STATUS will be a solid green, and the ONLINE light will be red.
The procedure is the same as for placing locks on a floor plan. For more information, see Placing Locks onto a Floor Plan.
Send a support request, and you will be connected to our expert