This section describes how to finalize the bus device configuration on the Net Bridge.
Make sure that you have:
- Connected all bus devices.
- Prepared the Net Bridge. See Preparing Net Bridge.
Proceed as follows.
This section describes how to finalize the bus device configuration on the Net Bridge.
Make sure that you have:
Proceed as follows.
Observe the green FUNC led for approximately one minute until the Net Bridge has saved the bus configuration. Check that:
Saving the bus configuration ends when the FUNC led is constantly illuminated green.
The procedure ends when constant green FUNC, RS-485 STATUS, SYSTEM STATUS, and SERVER CONN. leds are illuminated.